
Add to Cart
Water Treatment PP Melt Blown Filter Cartridge
Model: RPL
This product is a variety of tubular filter made of non-toxic tasteless polypropylene as the raw material, after melting, injection, traction and shaping.
Product character:
1. Filter element diameter is densification, even and high efficiency on filtration. As the particle will be “bridging” in the pore canal ,it will prevent the particle which owns a smaller diameter than the pore, the filtration effection gets a rate beyound 98%.
2. High cleanliness of itself,non-pollution to the water.
3. Corrosion preventive to the acid, alkali, etc chemical reagent and organic solvent.
4. High strength,it will not deformation when filtration in-out differential pressure is 0.4Mpa.
5. Low cost,can be used repeatedly by washing,so it will lower the cost.
ID & OD (mm) | Φ 30/65, Φ 28/65 etc. | ||||||
Length (mm) | 250, 500, 700, 1000 | ||||||
Filtration Accuracy (um) | 1, 3, 5, 10, 15, 20, 30, 50, 70, 100 | ||||||
Type | Without filter core, With filter core, Outer sheath | ||||||
Interface | Flat type, 222 type, 226 type | ||||||
End Cap | Flat type, Fin type | ||||||
Operating Pressure | ≤ 0.5Hpa | ||||||
Pressure Drop | ≤ 0.35Mpa | ||||||
Operating Temperature | ≤ 80ºC |
1. All filter components are subjected to a factory in-coming Quality Control checking and testing procedure.
2. Filter media are controlled by the Quality Control Laboratory to ensure all design parameters and test criteria meet specifications and performance results.
3. Throughout production & assembly, on line and laboratory controls & tests are made to ensure every perfect filter.
4. Representative filter from each batch type and production run are subjected to a complete test flow evaluation to determine efficiency, pressure drop and dust holding capacity.
5. To ensure that ex-factory products are maintained in perfect condition and are not damaged during transport to final destination.
1. Package Requirements: Carton box and pallets.
2. Delivery Time: 7-15 working days after advanced payment.
3. Ways of Transportation: By International express / air / sea / railway.
4. Loading Port: Shanghai Port, Tianjin Port, Qingdao Port or other Chinese ports.